开平(略)-4 油田(略)-1(略)块开发项目1d(略)软管发布评标结果公示项目名称:开平(略)-4 油田(略)-1(略)块开发项目1d(略)软管
项目编号:(略)
招标范围:开平(略)-4油田(略)-1(略)块开发项目包含(略)(1d(略)和2d(略))。(略)回接至圆筒型FPSO的开发模式,新建的圆筒型FPSO位于开平(略)-4油田(略)-1(略)块1d与2d(略)之间,平均作业水深约为(略)米。 从FPSO到1D水下PLET的2条约1.1km、ID (略)英寸 ((略).8mm) 动态柔性立管及配件; 从FPSO到1D水下PLET的1条约1.1km、ID 8英寸 ((略)mm) 动态柔性注CO2立管及配件; 上述3根软管的配件,包括拖拉头、永久锚固件、浮力块、配重块、限弯器等(略)招标人:(略)公司
开标时间:(略)-(略)-(略) (略):(略)公示开始时间: (略)-(略)-(略)评标公示截止时间: (略)-(略)-(略) (略):(略)候选人名单:无
中标候选人KAIPING (略)-4 OILFIELD (略)-1 BLOCK DEVELOPMENT PROJECT- Evaluation ResultsProject Name:KAIPING (略)-4 OILFIELD (略)-1 BLOCK DEVELOPMENT PROJECTBidding No.:(略)-(略)JDCP(略)Bidding Content:Kaiping (略)-4 oil field (略)-1 block development project contains two blocks ( 1d block and 2d block). The project adopts the development mode of subsea production system tying back to the newly-built cylindrical FPSO. The new-built cylindrical FPSO is located between 1d & 2d block of Kaiping (略)-4 oilfield (略)-1 block. The average water depth is about (略)m. Two(2) Flexible Risers from FPSO to 1D Subsea PLET. Length of both risers is approximately 1.1km. One(1) CO2 injection Flexible Riser from FPSO to 1D Subsea PLET. ID Length is approximately 1.1km. Accessories attached to three risers mentioned above including pull-in head assembly, split collar and topside hang-off assembly, distributed buoyancy modules, ballast modules, bend stiffener, etc.Bidding Agency:CNCCC International Tendering Co.,Ltd.Purchasers:Cnooc China LimitedOpen-Time of Bids:(略)-(略)-(略) (略):(略)Publicity start time: (略)-(略)-(略)Ending Date of Evaluation Result: (略)-(略)-(略) (略):(略)Who proposed the successful bidder:No Proposed Bidder-Winner异议受理人:(略)议受(略)